DIGEST
QUALITY FIRST TEAMS REFLECT
COMPANY‘S MISSION
GENEVA SATISFIES BOTH INTERNAL AND
EXTERNAL CUSTOMERS
In keeping with the Clinton
Mills mission of becoming
the preferred supplier in all of
its markets, the Bailey Plant
Quality First team has re
duced start marks in style
17359 by 28 percent.
Bailey’s original Quality
First Team was comprised of
Mary Hughes, Rosa Martin,
Sherri Heaton, Thomas
Motes, Ricky Warner, and
facilitator Mike Norris.
“This initial project was a
success and we all benefited
from working as a team,” said
Mike Norris, team facilitator. None of us knew where we were going when we began the project.
Everyone’s efforts were appreciated.”
To accomplish their goal of reducing start marks, team members studied the problem and
recorded volumes of data.
As a result of their statistical findings, the team identified at least twelve items which con
tributed to the start marks.
By focusing on these items and taking corrective action, associates reduced start marks by 28 %.
The team’s recommendations included overhauling defective letoffs and main drives, replacing
worn brakes, and adjusting warp tension.
When Vice President of Manufacturing Ted Davenport asked the team’s opinion of the team
approach to quality improvement, team member Ricky Warner stated that “any time you in
volve someone with expertise, you benefit. I usually go to the operator first to seek advice,
because the operator is the person who knows the machine best.”
To continue its quest for continuous improvement, a new Quality First team has been formed.
This team will study ways to improve section beams at the warper.
Included on this team are facilitators Mike Norris, Ricky Warner and Mary Hughes from
the initial team. New members include Earl Bryant from Slashing, James Williams, Warper
and Winder Technician, Johnnie McGowan, Winder Operator and Karen Mars, Warper
Operator.
Geneva formed its first
Quality First Action Team to
improve the condition of
loom rolls. The team was
formed from employees of
both weave rooms, the cloth
room and shop.
Unacceptable loom rolls
cause both processing and
quality problems. These un
acceptable rolls require cloth
inspectors to spend too much
of their time observing the
roll as it unwinds to ensure
that selvages pass through the
cloth guides properly.
Unacceptable loom rolls result in extensive backup and reroll. The telescoping effect on the
ends of unacceptable rolls contribute to oil, grease and dirt on roll ends.
The Quality First Action Team determined what acceptable and unacceptable criteria should
be for loom rolls. The cloth room team members, an internal customer, had major input on
these measures.
The team designed a measurement system which revealed that 50% of the loom rolls from
Plant #2 and 35% of the loom rolls from Plant #1 were unacceptable.
The team then identified the design of the roll tube as a possible cause of the problem. To
overcome this problem, they consulted with an outside supplier on making a loom roll tube
to their specifications.
The supplier developed a tube prototype which was tested by the team. The team found the
tube to be acceptable and now the tube designed by the QFAT is being used at a cost 28 % less
than the tube bought from the previous supplier.
Currently, unacceptable rolls have been reduced to 20% in both plants. Due to the increase
in acceptable loom rolls from the improved roll tubes, cloth inspectors can now focus their
attention on inspecting and grading the fabric.
In addition to satisfying an internal customer, the Quality First effort satisfied customers by
providing a finished roll with a straight wind free of selvage fly-outs, which have been a source
of customer complaints in the past.
CRANSTON SEES QUALITY FIRST
DURING VISIT TO CLINTON
Clinton employees demonstrated their ef
forts in Quality First to representatives of
Cranston Print Works as they toured Plant No.
2 and Bailey.
Accompanied by Operations Vice Presi
dent Josh Hamilton and Vice President of
Manufacturing Ted Davenport, President
Thad Williams guided Geoige Shuster, Bud
Eastwood, Tony Palazo, and Jim Grant
through Clinton’s operations.
The visitors were interested in the proce
dures used by Clinton to manufacture fabrics
used in Cranston’s printcloth operations.
Manufacturing associates were available to
answer questions asked by the visitors and to
point out those particular areas where Clinton
has achieved especially high levels of quality.
The Cranston visitors had an opportunity
to follow the fabric from its initial bale
opening process, through fiber and yarn
preparation stages. They saw the Company’s
state of the art shuttleless and air jet weaving
operations, cloth inspection processes, and
shipping department.
L
Karl Borgman
Rose Pfennington
BORGMAN AND PENNINGTON
NAMED PROCESS ENGINEERS
Karl Borgman and Rose Pennington have
been named Process Engineers.
The two will provide textile technology and
industrial engineering services to Clinton
Plants.
Borgman, a graduate of Clemson Univer
sity, joined Clinton as a Manufacturing Assis
tant in 1987. He was promoted to his present
position in April.
While at Clemson University, Borgman
worked as a Quality Control Technician at
Avondale Mills and was a Dean’s list student.
Pennington, a graduate of Piedmont
Technical College, joined Clinton in 1981 and
previously served as a frequency checker and
industrial engineer in the Technical Services
department. Prior to joining Clinton, she was
associated with Milliken and Company and
Union Carbide.
VOLPE JOINS
CLINTON
SALES CO.
We take this oppor
tunity to welcome
Gerald A. Volpe, Jr.,
who has joined the
Clinton Mills Sales Company in New York.
Jerry previously was Merchandise Manager
of the Retail Fabrics Division of Greenwood
Mills.
He is a graduate of the University of Dayton,
with an MBA in Marketing from New York
University.
Gerald A. Volpe, Jr.
EFA EARNS NATIONAL AWARD
FOR SAFETY BELT USE
EFA recently won a national safety award
from the National Highway Traffic Admin
istration for its associates’ high level of safe
ty belt use.
More than 83% of EFA associates were
judged to be in compliance with North
Carolina’s “Buckle Up For Safety Standards”
on arrival and departure from the plant park
ing lot. The off-the-job highway safety pro
gram is an extension of EFA’s in-plant safety
programs.
EFA and many companies throughout
North Carolina and the United States par
ticipated in the program.
In the near future, the National Highway
Traffic Administration will place a plaque
honoring EFA associates in its Washington,
D.C. office.
EFA INSTALLS NEW INSPECTION
AND PACKING SYSTEM
A new automated system for inspecting and
packaging finished fabric at EFA will improve
quality and delivery times.
The system was installed during vacation
break by the EFA Maintenance Department
and outside contractors. Thanks are extended
to Paul Tyson and Paul Fallaw, of Clinton,
whose efforts allowed the change to be ac
complished with a minimum of problems.
The improved system includes a new roll
takeup device for each inspection table. After
inspection, a conveyor system automatically
carries rolls to a central wrapping station. An
automatic system then carries the wrapped
rolls to holding bins. Finally, the rolls are car
ried from the bins to a station where the rolls
are cartoned, strapped, and automatically
stood on end.
Each inspection table also has been outfit
ted with a new main frame drive computer
system which computes the roll yardage,
prints bar coded roll tickets, and forwards the
information to the Customer Service Depart
ment for billing and shipping.